Specifications | C:\\Program Files\\Plotstream 2.2\\PSData\\PlotFiles\\Buttchen\\212024416\\PDF\\8-190f-Cover_Sheet.pl\ t.pdf mipplt |
Business section |

Specifications | C:\\Program Files\\Plotstream 2.2\\PSData\\PlotFiles\\Buttchen\\212024416\\PDF\\8-190f-Cover_Sheet.pl\ t.pdf mipplt |
Business section |
Specifications | C:\\Program Files\\Plotstream 2.2\\PSData\\PlotFiles\\Buttchen\\212024416\\PDF\\8-190f-Cover_Sheet.pl\ t.pdf mipplt |
Outline | 8-190f-Cover_Sheet.plt.pdf 8-190f-Equip_Layout.plt.pdf 8-190f-Struct_Layout.plt.pdf 8-190f-Struct_Details.plt.pdf 8-190f-Elec_Layout.plt.pdf 8-190f-Elec_Specs.plt.pdf 8-190f-Elec_Details.plt.pdf 8-190f-Elec_Details_2.plt.pdf 8-190f-Mech-Plumb_Layout.plt.pdf 8-190f-Equip_Details.plt.pdf 8-190f-Equip_Details_2.plt.pdf 8-190f-Equip_Details_3.plt.pdf |
Suggested Link Details/Purchase | |
Content | MRi Site Planning •Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation Project Manager prior to making changes. •Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors. •New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms. •Provide for refuse removal and disposal (e.g. crates, cartons, packing) 2. Power for drills and other test equipment, 3. Capability for image • Is this item ready? Will item be ready? 1 2 3 4 5 6 7 8 9 10 Item # All walls primed (final coat not needed on Day 1), and counter tops that will support equipment must be installed. No dust- producing cabinetry work in installation areas. Mechanical supplier has been provided with a set of equipment installation drawings for reference. For California, permitted construction drawings or PMI-specified installation drawings are required. Predict (Pre-ship) Equipment installation drawings must match actual room size and must meet clearance requirements. Deviations that meet installation requirements may be red-lined, if red-lining is allowed by local code. Seismic requirements are identified on construction drawings. Delivery route to installation or storage area meets requirements and has been discussed and scheduled with the customer. Ensure floor protection is discussed, requirements identified, and will be available at time of delivery and installation. Rooms that will contain equipment, including storage areas, are dust free. Room security to prevent unauthorized access and theft has been discussed with customer. The customer is aware of these security issues, implications and responsibility. In room HVAC ductwork and units (in room) must be mechanically installed and dust free. Installation rooms appear to meet environmental conditions (see Further Definitions) and observed issues have been communicated to the customer. If being stored, storage area must meet PIM storage criteria. Storage: Is item ready? Issued Date: 7/9/07 Rev 11 Conduit/electrical cable ducting/dividers/ access flooring installed, with the exception of surface-mounted floor ducting. Wiring to the main disconnect panel is installed and compliant with equipment installation drawings or pre-installation manual. Ceiling grid is installed, Unistrut is located per the installation drawings, and permanent lighting is installed and operational. Floor is clean and prepared for final floor covering. Customer has verified floor leveling meets the equipment installation drawings and PIM specs and no visible defects are observed. Gantry and table baseplate are installed prior to delivery (if applicable) Access to a working phone at the facility for emergency use, including MR magnet delivery. MI Supplier: Lead Installer: Phone Number: Inspection Date The customer is responsible for proper site preparation and site readiness regardless of any GEHC inspections/assessments. GEHC Minimum Requirements For MR Magnet Delivery: Ensure cryogen vents, power for the cooling system and exhaust fan system are installed and operational (0.7T, 1.5T & 3T) and chilled water supply is available 24x7 that meets system cooling equipment requirements. Comments If N , please enter in comments or action plan Verify (Delivery): Is item ready? Validate (Mech Install): Is item ready? Customer: GE Healthcare Site Readiness Checklist Helper: GEHC Global Order # : GEHC On-site Representative : Name of customer reviewed with : GEHC PMI : Target Site Prep Completion Date: GE Healthcare Customer Site ReadinessRequirementsDrawing Index A mandatory component of this drawing set is the GE Healthcare Preinstallation manual. Failure to reference the preinstallation manual will result in incomplete documentation required for site design and preparation. Preinstallation documents for GE Healthcare products can be accessed on the web at: http://www.gehealthcare.com/company/docs/siteplanning.html These sheets are a document set and should not be separated. Electrical information and references are contained on all sheets. GE Equipment DeliveryRequirements Items 1 through 8 on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipmentdelivery to the installation site. Equipment will not be delivered if these requirements are not satisfied. * REQUIRED REFERENCE * Preinstallation Manual These equipment installation drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the installation and operation of such equipment in compliance with GE Healthcare s written specifications and all applicable federal, state, and/or local requirements. |
Navigation | Previous Page / Next Page |
Suggested Link Details/Purchase | |
Following Datasheets | 8-194 (3 pages) 8-194f (12 pages) 8-198 (3 pages) 8-198f (11 pages) 8-202 (3 pages) 8-202f (11 pages) 8-206 (3 pages) 8-206f (10 pages) 8-210 (3 pages) 8-210f (10 pages) |
Check in e-portals![]() |
World-H-News Products Extensions Partners Automation Jet Parts |
Sitemap Folder | group1 group2 group3 group4 group5 group6 group7 group8 group9 group10 group11 group12 group13 group14 group15 group16 group17 group18 group19 group20 group21 group22 group23 group24 group25 group26 group27 group28 group29 group30 group31 group32 group33 group34 group35 group36 group37 group38 group39 group40 group41 group42 group43 group44 group45 group46 group47 group48 group49 group50 group51 group52 group53 group54 group55 group56 group57 group58 group59 group60 group61 group62 group63 group64 group65 group66 group67 group68 group69 group70 group71 group72 group73 group74 group75 group76 group77 group78 group79 group80 group81 group82 group83 group84 group85 group86 group87 group88 group89 group90 group91 group92 group93 group94 group95 group96 group97 group98 group99 group100 Prewious Folder Next Folder |