| Outline | FACILITY SAFETY 1. OBJECTIVES 2. CANCELLATION 3. APPLICABILITY a. DOE Elements b. DOE Contractors c. Exclusions 5. RESPONSIBILITIES a. Assistant Secretary for Environment, Safety and Health b. Secretarial Officers (SOs) c. Director, Office of Security and Safety Performance Assurance d. Heads of Field Elements e. Contracting Officers 7. REFERENCES a. Public Law (P.L.) b. Executive Orders (E.O.) c. Code of Federal Regulations (CFR) d. DOE Directives e. DOE Technical Standards (STD) f. Department of Defense (DoD) Documents g. Non-Government Standards 9. CONTACT |
| Suggested Link Details/Purchase | |
| Content | IV-2 DOE O 420.1B 12-22-05 (c) compliance with seismic requirements of E.O. 12699, Seismic Safety of Federal and Federally Assisted or Regulated New Building Construction (as amended by E.O. 13286, Amendment of Executive Orders, and Other Actions, in Connection With the Transfer of Certain Functions to the Secretary of Homeland Security, January 5, 1990). (3) Additions and modifications to existing DOE facilities must not degrade SSC performance during an NPH occurrence. b. Evaluation and Upgrade Requirements for Existing DOE Facilities. (1) SSCs in existing DOE facilities must be evaluated when there is a significant degradation4 in the facility safety basis. Evaluations must address the safety significance of the SSCs and the seismic requirements of E.O. 12941, Seismic Safety of Existing Federally Owned or Leased Buildings. (2) If the evaluation of existing SSCs identifies NPH mitigation deficiencies, an upgrade plan must be implemented on a prioritized schedule based on the safety significance of the upgrades, time or funding constraints, and mission requirements. c. NPH Assessment. (1) Both facility design and evaluation criteria must address the potential types of NPH occurrences. The NPH assessment must use a graded approach commensurate with the potential hazard of the facility. (2) NPH assessment for new facilities must use a graded approach that considers the consequences of all types of NPHs. Site-wide information may be considered when appropriate. (3) NPH assessments must be reviewed and upgraded as necessary for existing sites/facilities following significant changes in NPH assessment methodology or site-specific information. (4) An NPH assessment review must be conducted at least every 10 years and must include recommendations to DOE for updating the existing assessments based on significant changes found in methods or data. If no change is warranted from the earlier assessment, then this only needs to be documented. 4 See DOE G 420.1-2 for additional guidance on significant degradation. Downloaded from http://www.everyspec.com on 2012-02-02T18:37:15. |
| Navigation | Previous Page / Next Page |
| Following Datasheets | download_php-spec_DOE_Project_Management_Practices_Oct_2000_002489 (534 pages) download_php-spec_DOE_P_413_2_00000193 (2 pages) download_php-spec_DOE_P_413_1_010393 (3 pages) download_php-spec_DOE_P_413_2_010394 (2 pages) download_php-spec_DOE_STD_1022_94_3439 (41 pages) download_php-spec_DOE_STD_1023_95_3398 (45 pages) download_php-spec_DOE_STD_1027_92_3479 (49 pages) download_php-spec_DOE_STD_1073_2003_CONFIGURATION_MGMT_3441 (124 pages) download_php-spec_DOE_STD_113499_2314 (23 pages) download_php-spec_DON_FOREIGN_DISCLOSURE_MAN_2007_035499 (112 pages) |
Check in e-portals![]() |
World-H-News Products Extensions Partners Automation Jet Parts |
| Sitemap Folder | group1 group2 group3 group4 group5 group6 group7 group8 group9 group10 group11 group12 group13 group14 group15 group16 group17 group18 group19 group20 group21 group22 group23 group24 group25 group26 group27 group28 group29 group30 group31 group32 group33 group34 group35 group36 group37 group38 group39 group40 group41 group42 group43 group44 group45 group46 group47 group48 group49 group50 group51 group52 group53 group54 group55 group56 group57 group58 group59 group60 group61 group62 group63 group64 group65 group66 group67 group68 group69 group70 group71 group72 group73 group74 group75 group76 group77 group78 group79 group80 group81 group82 group83 group84 group85 group86 group87 group88 group89 group90 group91 group92 group93 group94 group95 group96 group97 group98 group99 group100 Prewious Folder Next Folder |