Specifications | QUAM_0104_5_SYSTEM18_11NO17 Owner |
Business section |

Specifications | QUAM_0104_5_SYSTEM18_11NO17 Owner |
Business section |
Specifications | QUAM_0104_5_SYSTEM18_11NO17 Owner |
Outline | QUAM_0104_5_SYSTEM18 8092=} SYSTEM 18_20_11_NO10 |
Suggested Link Details/Purchase | |
Content | 234 East Marquette Road, Chicago, IL 60637 Phone: (800) NEED NOW Fax: (888) NEED NOW (800) 633 - 3669 (888) 633 - 3669 E-Mail: neednow@qnc.com www.quamspeakers.com (1’ x 2’) SYSTEM 18 – includes 8-Ohm and /25RS versions (2’ x 2’) SYSTEM 20 – includes 8-Ohm and /25RS versions INSTALLATION INSTRUCTIONS © 2011 Quam-Nichols Company Quam-Nichols reserves the right to make changes and/or improvements to its products at any time and without notice. 11-11.10 8092 INTENDED USE: All versions: Indoor environment, mounted parallel to floor plane in a 24” wide, suspended ceiling tile grid; mount height 18’ or less above floor plane. Program material: Signal tones, voice and music. 1. Cut ceiling tile as required: 1’ x 2’ FORMAT LOUDSPEAKER 2’ x 2’ tile – Cut tile in half along one axis. 2’ x 4’ tile – Cut 12” from edge along 2’ axis and discard smaller piece. 2’ x 2’ FORMAT LOUDSPEAKER 2’ x 2’ tile – No cutting required. 2’ x 4’ tile – Cut tile in half along 2’ axis. ! Steps 2-3 – Required only if using conduit clamp fitting other than what is provided with product. 2. Loosen, but do not remove screws on cover plate; push up and remove plate from assembly. 3. Remove cable /conduit clamp fitting from plate; install UL Listed metallic enclosure entry fitting for plenum cable or flex whip. 4. Feed supply cable through whip to connector. Make connections per wiring diagrams below; Insulate all unused taps from each other, the enclosure and electrical ground. When cover plate is secured, all connections / splices and unused leads must be inside of the enclosure. . 5. Place assembly onto ceiling grid, install 24” T-bar trim piece, where required (furnished only with specific 1’ x 2’ formats.) NOTE! AHJ/ local codes may require tie-off to structure. Bend up tie-off tabs as shown in illustration and install as directed. NOTE! AHJ/ local codes may require tie-down to grid. Recommended fasteners; not supplied: Erico/Caddy part ATA4i and 1/4”-20 x 2” bolt, or equivalent. Install as directed. 6. Place remaining ceiling tile into opening as required. Tie-off tab 4x BLACK ( Common )BLACK ( Common ) 8Ω8Ω QUAM 8-Ohm OperationQUAM 8-Ohm Operation REDRED Tie-off 2x places Tie-off 4x places |
Navigation | Previous Page / Next Page |
Following Datasheets | QUAM_0104_5_SYSTEM19_X (2 pages) QUAM_0104_5_SYSTEM20_1 (2 pages) QUAM_0104_5_SYSTEM5 (2 pages) QUAM_0104_5_SYSTEM5_8_1 (1 pages) QUAM_0104_6_CUSTOMERSPECIFIEDASSEMBLY_1 (2 pages) QUAM_0105_MA_E5_S7_T8_1 (1 pages) QUAM_0105_MA_E6_S2_T1_1 (2 pages) QUAM_0105_MA_E6_S4_T1_1 (1 pages) QUAM_0105_MA_E8_S2_T1_1 (2 pages) QUAM_0105_MA_E9_S2_T8_1 (1 pages) |
Check in e-portals![]() |
World-H-News Products Extensions Partners Automation Jet Parts |
Sitemap Folder | group1 group2 group3 group4 group5 group6 group7 group8 group9 group10 group11 group12 group13 group14 group15 group16 group17 group18 group19 group20 group21 group22 group23 group24 group25 group26 group27 group28 group29 group30 group31 group32 group33 group34 group35 group36 group37 group38 group39 group40 group41 group42 group43 group44 group45 group46 group47 group48 group49 group50 group51 group52 group53 group54 group55 group56 group57 group58 group59 group60 group61 group62 group63 group64 group65 group66 group67 group68 group69 group70 group71 group72 group73 group74 group75 group76 group77 group78 group79 group80 group81 group82 group83 group84 group85 group86 group87 group88 group89 group90 group91 group92 group93 group94 group95 group96 group97 group98 group99 group100 Prewious Folder Next Folder |