Specifications | Carlon 2005 Master Catalog |
Business section |

Specifications | Carlon 2005 Master Catalog |
Business section |
Specifications | Carlon 2005 Master Catalog |
Suggested Link Details/Purchase | |
Content | www.carlon.com267 Intra-Gard®Field Cuts Joining a Male/Female Connection 1.The pipes should be laid side by side and the male end marked at the base of the bell on the female end. 2.Make a straight through cut on the male end using a standard carpenter’s saw.Deburr the ends of the cut pipe. 3.Apply Carlon Quick Set Cement in a thin uni- form coating to the inside surface of the sock- ets and raise both ends and align the ducts on the male ends to the bells on the female end. 4.Once the ducts are aligned with their sockets, lower both of the pipes.The ducts will be auto- matically returned to their original position as the joints are forced together. Field Cuts Repairing Damaged Intra-GardThat Is Vacant 1.Cut out damaged section making a flush cut on both sides and deburr all pipes. 2.Measure damaged section and new section wIth a socket and measure from base of socket and cut flush.Intra-Gard couplings are installed onto the individual ducts of the section in the ground. 3.Install new section in trench by first applying Carlon Quick Set Cement and pushing sockets onto either spigot ends. 4.Line up ducts with couplings and raise or bow center of duct span,apply cement and slip ducts into couplings. Repairing Intra-Gard ®Once Installed Joining Two Male Ends 1.The pipes should be laid side by side,marked and flush cut to butt up against each other.Deburr the ends of the cut pipe and install a spare spacer if needed,and use standard couplings. 2.Place each individual coupling onto ducts using Carlon Quick Set Cement. 3.Lift sections to align each coupling with other ducts. 4.Lower both sections to a level position. Repair sections may use a standard 20 length of lntra-Gard with sockets and cut to length. Repairing Intra-Gard Housing a Cable 1.Carefully cut out the damaged section of the Intra-Gard. 2.Where cable is installed,slide the split couplings onto each individual duct,fitting the cable into the grooved coupling passage.Repeat the process on the other side. 3.Carefully insert the cable into the split duct.Push the split duct into the split coupling at both ends.Wrap all slit areas with sealing tape or shrink wrap,etc.as rec- ommended by specifier to seal out water. 4.Install stop coupling onto other vacant ducts with Carlon Quick Set Cement and install the ducts into the other openings of the couplings with cement. 5.Ensure the duct system is straight and even before encasing in soil. |
Navigation | Previous Page / Next Page |
Following Datasheets | mastering_cisco_webex_meeting_center (3 pages) mastering_cisco_webex_training_center (3 pages) MasterSeungsTaekwondoCaseStudy (1 pages) MatchAFXInstallationInstructions (47 pages) Matrix_switcher_user_manual (49 pages) matrix-field-service-assistance_spec (2 pages) matrix-switchers-selection-guide (1 pages) Max_3D_IFA_EU (3 pages) MAX (5 pages) MAX1Rm (2 pages) |
Check in e-portals![]() |
World-H-News Products Extensions Partners Automation Jet Parts |
Sitemap Folder | group1 group2 group3 group4 group5 group6 group7 group8 group9 group10 group11 group12 group13 group14 group15 group16 group17 group18 group19 group20 group21 group22 group23 group24 group25 group26 group27 group28 group29 group30 group31 group32 group33 group34 group35 group36 group37 group38 group39 group40 group41 group42 group43 group44 group45 group46 group47 group48 group49 group50 group51 group52 group53 group54 group55 group56 group57 group58 group59 group60 group61 group62 group63 group64 group65 group66 group67 group68 group69 group70 group71 group72 group73 group74 group75 group76 group77 group78 group79 group80 group81 group82 group83 group84 group85 group86 group87 group88 group89 group90 group91 group92 group93 group94 group95 group96 group97 group98 group99 group100 Prewious Folder Next Folder |